-
The Elematic Stressing Abutment P7 is designed to hold the stressing strands of hollow core slabs during prestressed precast concrete production. The Stressing Abutment P7 includes a pair of abutments, one active abutment for bundle stressing, and one passive abutment.
-
Structural engineering services offers a comprehensive view of the factors affecting the feasibility of precast in your project.
As a result, you will receive a detailed design for developing framing plans, connection details, quantities and a tender package, as well as construction/fabrication drawings and documentation.
A peer review will help you validate and optimize the design.
-
The Elematic table E9 is designed to operate as part of a circulation line during precast concrete production. It is intended for the manufacture of sandwich panels, solid panels, cladding panels and solid slabs.
Do you have questions? Contact us!
or