Skip navigation

Stressing abutment P7

The Elematic Stressing Abutment P7 is designed to hold the stressing strands of hollow core slabs during prestressed precast concrete production. The Stressing Abutment P7 includes a pair of abutments, one active abutment for bundle stressing, and one passive abutment.

Stressing abutment P7-300

Length 200 mm
Width 1200 mm
Height 650 mm
Weight, pair 1300 kg
Max prestressing force 300 t

The Stressing Abutment P7 is suitable for single strand stressing. To equip a casting bed for prestressing, a pair of abutments is required; one for each end of the bed, the active end and the passive end.

The abutments at both ends are mounted directly in the concrete foundation of the bed. The total maximum stressing force is 300 tons.

The abutment is equipped with necessary fittings.

BUILT-IN SAFETY

Like all Elematic machinery, safety features are built in. The Stressing Abutment P7 meets the EC Machine Directive requirements. It comes with thorough, clear operator, maintenance and safety manuals in the required language.

CONSTRUCTION

The Abutment P7 is made from thick steel plate. It has holes for all typical strandings used in hollow core production.

Goes with

Precast products

Do you have questions? Contact us!

Accept cookies to see the form or visit our contact page for more information.

or

Accept cookies to see the form or visit our contact page for more information.