Skip navigation

Stacking frame P7

The Elematic stacking frame P7 designed for safe lifting of cast and empty tables in standard precast wall production.

Stacking frame P7-22

Maximum loading capacity 22 t
Overhead crane required for the stacking frame (not included in the delivery) Min. 4 x 6.3 t

The stacking frame P7 is used to lift the cast tables to the stack – this way the space needed for the curing of products is minimized.

From the casting and compaction station a table is lifted onto the curing stack by the stacking frame connected to the overhead crane. The lifting, moving, and turning of the hooks is controlled with the push buttons of the crane controller.

COMPOSITION

The structure of the stacking frame P7 is made of steel. The beam has four to six hydraulic lifting hooks according to the table size. The hooks are controlled with the controller of the crane. The stacking frame has four lifting eyes for the crane hooks.

BUILT-IN SAFETY

The stacking frame P7-22 meets EC Machine Directive requirements and comes with thorough and clear operator, maintenance and safety manuals in the required language.

A part of

Do you have questions? Contact us!

Accept cookies to see the form or visit our contact page for more information.

or

Accept cookies to see the form or visit our contact page for more information.